-
- Global
- Algeria, Djazair
- Angola
- Argentina
- Australia
- Austria
- Belgium
- Brazil
- Canada
- Chile
- China
- Cyprus
- Dominicana
- Colombia
- Ecuador
- Egypt
- EU Intermodal
- Germany
- Hong Kong
- Hungary
- India
- Indonesia
- Italy
- Malaysia
- Mozambique
- Netherlands
- New Zealand
- Pakistan
- Panama
- Peru
- Philippines
- Poland
- Romania
- Rwanda
- Saudi Arabia
- Senegal
- Serbia
- Singapore
- Somaliland
- South Korea
- Spain
- Suriname
- Thailand
- Turkiye
- United Arab Emirates
- Ukraine
- United Kingdom
- USA
- Vietnam
-
Menu
-
About Us
Related content
- Port Services
- Safety Inductions for Hauliers
- Sustainability
Facilities
Infrastructures and dimensions:
- M2 Yard: 130.000 m2.
- M2 Workshops / sheds: 2.700 m2.
- Ml. Quay: 800 m.
- RoRo ramps: 2.
- Rail link (capacity): 3 x 750 m rail track.
Capacities
- Productivity: close to 30 moves x crane x hour.
- Annual TEUs: 300.000+-400.000.
- Ground slots: 12.500.
- Reefer: 200 plugs.
Human team
- Executive team: 7.
- Management / technical team: 40.
- Production team: 21.
Equipment
- Super Post Panamax cranes: 3.
- Panamax cranes: 2.
- Mobile Harbor Crane: 1.
- RTG's: 10.
- Tug-master: 14.
- Reach stacker: 4.
- Forklifts: 5.
- Trailers: 12.
Software
The management of these resources and infrastructure is done through a sophisticated software that, using a wireless network, real-time manages all operations of the terminal.
DP World Tarragona uses the most advanced technology in control systems and cargo handling management.
The software that the terminal makes available to its customers, accessible from the website's user area, allows them to monitor, plan, review and report on how to perform any operations. These include loading and unloading; entries and departures, stocked units...
These operations are reported in real time, and can be selective based on the most used standard EDI formats (SMGD): BAPLIE, CODECO, COARRI... XLS, DBF, MDB, ASCII.