-
- Global
- Algeria, Djazair
- Angola
- Argentina
- Australia
- Austria
- Belgium
- Brazil
- Canada
- Chile
- China
- Cyprus
- Dominicana
- Colombia
- Ecuador
- Egypt
- EU Intermodal
- Germany
- Hong Kong
- Hungary
- India
- Indonesia
- Italy
- Malaysia
- Mozambique
- Netherlands
- New Zealand
- Pakistan
- Panama
- Peru
- Philippines
- Poland
- Romania
- Rwanda
- Saudi Arabia
- Senegal
- Serbia
- Singapore
- Somaliland
- South Korea
- Spain
- Suriname
- Thailand
- Turkiye
- United Arab Emirates
- Ukraine
- United Kingdom
- USA
- Vietnam
-
Menu
-
About Us
Related content
Who We Are
DP World is the leading provider of smart logistics solutions, enabling the flow of trade across the globe.
Read MoreInvesting in Growth
By 2025 DP World will invest almost 200 million euros to boost Antwerp Gateway’s capacity by a third up to 3.4 million TEUs.
Read More -
Services
Related content
Antwerp Gateway
Located at the upper end of the tidal estuary of the Scheldt, DP World Antwerp Gateway has excellent nautical access for the largest container vessels afloat.
Read MoreEmpty Depot Services
Our off dock empty depot at the left bank of the river Scheldt offers a broad range of container services to Antwerp Gateway customers, such as storage, maintenance and repair.
Read More - Connectivity
-
Smart Trade
Related content
Route 1700 app
The Route 1700 app makes truck visits at DP World Antwerp easier. Truckers and dispatchers can check our busiest times and view current activity, traffic & other appointments. Truckers can plan their visit, according to their schedule.
Read More -
Sustainability
Related content
Our Approach
DP World’s ‘Our World, Our Future’ sustainability strategy helps us to work in a responsible way that prioritises sustainability and impact on the people, communities and environment...
Read MoreSustainability Report
We are dedicated to sharing what we do with our customers, suppliers and partners to encourage sustainable practice.
Read More
DP WORLD ANTWERP GATEWAY STARTS EXPANSION OF TERMINALS CAPACITY BY 1 MILLION TEU
Date: 18/12/2020
DP World Antwerp Gateway is starting the expansion of the terminal's capacity by 1 million TEU by ordering 4 additional quay cranes and 17 Automatic Stacking Cranes (ASC) modules.
After securing the new refinancing package mid-2020, DP World Antwerp Gateway is now starting the expansion of the terminal's capacity by 1 million TEU by ordering 4 additional quay cranes and 17 Automatic Stacking Cranes (ASC) modules. The investment amounts to 200 million euros and will be implemented in phases by 2026.
1 million TEU extra capacity
By 2026, DP World Antwerp Gateway will invest 200 million euros to increase the capacity of the terminal at the Deurganckdok (quay 1700) by 1 million TEU (container units). This will take place in 6 phases, of which the first phase will be completed in June 2021 with the commissioning of the new operational building for dock workers and employees.
From phase 2 onwards, straddle carrier stacking zones will be converted into zones with Automatic Stacking Cranes and additional quay cranes will be put into use. In this way, the capacity will systematically increase every year as from 2022 until 2026.
Automation for extra capacity on the same surface
Antwerp Gateway is the only terminal in the port of Antwerp using this technology and currently employs 10 modules with Automated Stacking Cranes. The expansion plan comprises investments in 17 additional modules to convert and further automate the remaining traditional straddle carrier stacks. In the new ASC modules, the containers can be stacked higher (up to 6 high instead of 3 high) and closer (30 cm instead of 1m70) as opposed to a traditional straddle carrier stack, which means that an extra 1 million TEUs can be handled on the same surface.
The fully automated modules also operate on 100% green energy and are an example of sustainability within container terminal operations.
The expansion plan also includes the purchase of additional quay cranes, hybrid straddle carriers and the second rail crane to operate the rail tracks so that in the long term more containers can be transported in and out by rail. Finally digital applications will be further developed.
Dirk Van den Bosch, CEO DP World Antwerp Gateway:
“After the first year-half, which was characterized by a series of blank sailings due to Corona, we have seen volumes steadily increase since June at our Antwerp Gateway terminal. In October, the all-time record in the terminal's 15 year existence has been broken. These investments in the expansion of the terminal's capacity, through automation and maximization of the current available area, should enable us to continue our growth path in the coming years.”